Kenya CBE Educator Handbook · 5 min read

TSC TPAD & DQAS Inspection Checklist for Kenyan Teachers & HODs

Complete term-opening professional records checklist covering schemes of work, lesson plans, records of work covered, progress records, and CBE portfolios.

Explore ElimuKit School Alignment Tools

Five Professional Records Verified During Appraisals

During Teacher Performance Appraisal and Development (TPAD) evaluations and Directorate of Quality Assurance and Standards (DQAS) institutional audits in Kenya, Headteachers, Principals, Heads of Department (HODs), and Quality Assurance Officers examine five interrelated classroom documents:

1. Approved 10-Column Schemes of Work prepared prior to term opening, displaying school headers, chronological weeks/lessons, verified KICD strands/sub-strands, and an official HOD/Headteacher stamp and signature.

2. Current Daily Lesson Plans (typically 30 min Pre-Primary, 35 min Primary, 40 min Junior School, 45 min Senior School per school timetable) mapped directly to timetable slots with explicit Core Competencies, Values, and Pertinent & Contemporary Issues (PCIs).

3. Record of Work Covered logged chronologically immediately after teaching each sub-strand, paired visually with handwritten post-lesson entries inside Column 10 (Reflection) of the printed scheme.

4. Learner Progress & KNEC Formative Assessment Records tracking continuous competency achievement across Exceeds Expectations (EE), Meets Expectations (ME), Approaches Expectations (AE), and Below Expectations (BE).

5. Evidence of Community Service Learning (CSL), Digital Literacy integration, and structured learner assessment portfolios stored safely by class stream.

Why Pre-Term Format Verification Matters

Inspectors consistently flag outdated 8-4-4 scheme layouts, pre-typed Reflection columns completed before lessons occur, and mismatched lesson counts after KICD rationalization. Compiling schemes directly from verified rationalized sub-strands eliminates compliance risk across an entire school department.

Frequently Asked Questions

Does ElimuKit format Word exports ready for HOD/Headteacher stamp and sign-off?

Yes. Editable Microsoft Word (.docx) scheme downloads include school institution metadata header blocks and blank post-lesson Reflection cells tailored for clean A4 printing and filing.

How early should teachers submit schemes of work for HOD approval?

Most Kenyan primary, junior, and senior schools require signed 10-column schemes to be submitted during the opening week (Week 1) of Term 1, Term 2, and Term 3 before instructional supervision begins.