Grade 11 Metalwork Term 2 Schemes of Work
Suggested Term 2 teaching sequence for Grade 11 Metalwork covering 2.0 TOOLS AND MATERIALS IN METALWORK, 3.0 RELATED DRAWING IN METALWORK. Official KICD designs provide the authoritative annual sequence and do not prescribe Term 1/2/3 assignments; ElimuKit sequentially partitions verified units across three terms for planning convenience.
Term 2 10-Column Sample Entries (Weeks 1–2)
| Wk | Lsn | Strand | Sub-strand | Specific Learning Outcomes | Learning Experiences | Key Inquiry Questions | Learning Resources | Assessment | Reflection |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 2.0 TOOLS AND MATERIALS IN METALWORK | 2.3 Alloy steels | By the end of the substrand, the learner should be able to: classify different types of alloy steels used in Metalworking industry | use print or digital media to search for information on the alloying elements used in production of alloy steels (Chromium, Nickel, Molybdenum, Manganese, Tungsten, Cobalt, Vanadium, Silicon) | What are alloy steels? | Digital devices with instructional video clips; Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear | Oral questions; Observation; Practical assessment | |
| 1 | 2 | 2.0 TOOLS AND MATERIALS IN METALWORK | 2.3 Alloy steels | By the end of the substrand, the learner should be able to: explain the key properties of alloy steels used in the metalworking industry | use print or digital media to search for information on the types of furnaces used in production of alloy steel (basic oxygen, Bessemer converter, open hearth and electric furnace) | What are alloy steels? | Digital devices with instructional video clips; Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear | Oral questions; Observation; Practical assessment | |
| 1 | 3 | 2.0 TOOLS AND MATERIALS IN METALWORK | 2.4 Project | By the end of the substrand, the learner should be able to: identify a problem in the community that can be solved using the knowledge and skills acquired in study of Metalwork | select an item that can be made using locally available resources to solve the identified problem | What are some of the applications of metals in the locality? | Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear; Personal protective equipment (safety goggles, gloves, helmet, boots) | Oral questions; Written test; Written assignments | |
| 1 | 4 | 2.0 TOOLS AND MATERIALS IN METALWORK | 2.4 Project | By the end of the substrand, the learner should be able to: propose an item that can be made to solve the identified problem | develop a fabrication procedure for the selected item, including materials, tools, steps, and safety considerations. | What are some of the applications of metals in the locality? | Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear; Personal protective equipment (safety goggles, gloves, helmet, boots) | Oral questions; Written test; Written assignments | |
| 2 | 1 | 3.0 RELATED DRAWING IN METALWORK | 3.1 Surface development | By the end of the substrand, the learner should be able to: describe methods of surface development in sheet metalwork | watch video clips on the methods of surface developments used in Metalwork (straight line, parallel line, transition, radial line) | Why is the study surface development important in Metalwork? | Digital devices with instructional video clips; Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear | Oral questions; Observation; Practical assessment | |
| 2 | 2 | 3.0 RELATED DRAWING IN METALWORK | 3.1 Surface development | By the end of the substrand, the learner should be able to: construct surface developments of different figures used in sheet metal | draw surface development of a cube, pyramid, conical and cylindrical shapes on a plain paper using drawing instruments | Why is the study surface development important in Metalwork? | Digital devices with instructional video clips; Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear | Oral questions; Observation; Practical assessment |
Term 2 Sequentially Partitioned Sub-strands & Objectives
2.3 Alloy steels
- classify different types of alloy steels used in Metalworking industry
- explain the key properties of alloy steels used in the metalworking industry
- describe the processes of alloy steel production as used in Metalworking industries
Key Inquiry: What are alloy steels?
Learning Resources: Digital devices with instructional video clips; Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear; Technical demonstration models and case study cards
Assessment Methods: Oral questions; Observation; Practical assessment
2.4 Project
- identify a problem in the community that can be solved using the knowledge and skills acquired in study of Metalwork
- propose an item that can be made to solve the identified problem
- fabricate an item that can be used to solve the identified problem in the community
Key Inquiry: What are some of the applications of metals in the locality?
Learning Resources: Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear; Personal protective equipment (safety goggles, gloves, helmet, boots); First Aid kit and fire extinguisher models
Assessment Methods: Oral questions; Written test; Written assignments
3.1 Surface development
- describe methods of surface development in sheet metalwork
- construct surface developments of different figures used in sheet metal
- demonstrate how intersecting and truncated surfaces are drawn in Metalwork
Key Inquiry: Why is the study surface development important in Metalwork?
Learning Resources: Digital devices with instructional video clips; Metalwork tools (hacksaw, files, try-square, vernier calipers, bench vice); Sheet metal samples, soldering/joining equipment, and protective gear; Drawing boards, T-squares, and set squares (30°/60° and 45°)
Assessment Methods: Oral questions; Observation; Practical assessment
3.1 Orthographic projection
- explain the term orthographic projection as used in technical drawing
- draw orthographic views of shaped blocks in a given projection
- embrace the use of orthographic projection in technical drawing
Key Inquiry: What are the applications of orthographic projection in real life?
Learning Resources: Drawing boards, T-squares, and set squares (30°/60° and 45°); Pair of compasses, dividers, drawing papers, and masking tape; Technical drawing worksheets and projection charts; Approved Grade 11 Metalwork Learner's Book
Assessment Methods: Oral questions; Observation; Practical assessment
KICD Curriculum Source & Editorial Verification
Compiled directly from verified curriculum unit records matching KICD design KICD-SS-Grade11-MTL. ElimuKit preserves official strand/sub-strand codes, lesson allocations, and Key Inquiry Questions without fabricated topics. Read verification methodology →
- Metalwork_Grade_11_-_October_2025.pdf (Printed pages 7–18) · 4 verified sub-strand units
Frequently Asked Questions
What topics are covered in Grade 11 Metalwork Term 2?
This suggested Term 2 sequence groups 4 of 12 verified KICD sub-strands (2.0 TOOLS AND MATERIALS IN METALWORK, 3.0 RELATED DRAWING IN METALWORK) totaling 50 lessons from the annual Grade 11 Metalwork KICD design.
Is this Term 2 division an official KICD term allocation?
No. Official KICD curriculum designs provide the authoritative annual sequence and do not prescribe Term 1, Term 2, or Term 3 assignments (our verified curriculum dataset contains no official term field). ElimuKit sequentially partitions verified units across the three terms for planning convenience—making these term divisions practical planning suggestions rather than official KICD term allocations. You can adjust strand selections for Term 2 in the scheme generator.