Grade 12 Building Construction Term 2 Schemes of Work
Suggested Term 2 teaching sequence for Grade 12 Building Construction covering 3.0 BUILDING CONSTRUCTION PROCESSES. Official KICD designs provide the authoritative annual sequence and do not prescribe Term 1/2/3 assignments; ElimuKit sequentially partitions verified units across three terms for planning convenience.
Term 2 10-Column Sample Entries (Weeks 1–2)
| Wk | Lsn | Strand | Sub-strand | Specific Learning Outcomes | Learning Experiences | Key Inquiry Questions | Learning Resources | Assessment | Reflection |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 3.0 BUILDING CONSTRUCTION PROCESSES | 3.1 Wall Finishes | By the end of the substrand, the learner should be able to: identify types of tools and equipment used for applying wall finishes | use print or digital media to discuss types of tools and equipment used for applying wall finishes | Why are wall finishes important on a building? | Digital devices with instructional video clips; Resource person guide and field observation sheets; Masonry and construction tools (trowel, spirit level, plumb bob, tape measure) | Oral questions; Observation; Practical assessment | |
| 1 | 2 | 3.0 BUILDING CONSTRUCTION PROCESSES | 3.1 Wall Finishes | By the end of the substrand, the learner should be able to: describe types of wall finishes applied on buildings | take a gallery walk to identify tools used for applying wall finishes | Why are wall finishes important on a building? | Digital devices with instructional video clips; Resource person guide and field observation sheets; Masonry and construction tools (trowel, spirit level, plumb bob, tape measure) | Oral questions; Observation; Practical assessment | |
| 1 | 3 | 3.0 BUILDING CONSTRUCTION PROCESSES | 3.2 Floor Finishes | By the end of the substrand, the learner should be able to: identify different types of floor finishes applied in buildings | use print or digital media to discuss different types of floor finishes (tiles, wood and timber, terrazzo, carpet, concrete, stone, resin and epoxy, screed, resilient flooring, clay and earthen finishes) | Why are floor finishes important in building? | Digital devices with instructional video clips; Resource person guide and field observation sheets; Masonry and construction tools (trowel, spirit level, plumb bob, tape measure) | Oral questions; Observation; Practical assessment | |
| 1 | 4 | 3.0 BUILDING CONSTRUCTION PROCESSES | 3.2 Floor Finishes | By the end of the substrand, the learner should be able to: select a suitable floor finish for a building | take a walk around the school compound to observe different types of floor finishes in buildings | Why are floor finishes important in building? | Digital devices with instructional video clips; Resource person guide and field observation sheets; Masonry and construction tools (trowel, spirit level, plumb bob, tape measure) | Oral questions; Observation; Practical assessment | |
| 2 | 1 | 3.0 BUILDING CONSTRUCTION PROCESSES | 3.3 Ceilings | By the end of the substrand, the learner should be able to: identify different types of ceilings used in buildings | use visual aids to discuss types of ceilings based on the form of construction (suspended, vaulted) | What is the need for ceilings in buildings? | Realia and locally available materials (timber, manufactured boards, gypsum, PVC); Drawing boards, T-squares, and set squares (30°/60° and 45°); Pair of compasses, dividers, drawing papers, and masking tape | Oral questions; Aural and oral assessment; Peer and self-assessment | |
| 2 | 2 | 3.0 BUILDING CONSTRUCTION PROCESSES | 3.3 Ceilings | By the end of the substrand, the learner should be able to: select materials used for ceilings in a building | use visual aids to discuss types of materials used for ceiling construction (timber, manufactured boards, gypsum, PVC) | What is the need for ceilings in buildings? | Realia and locally available materials (timber, manufactured boards, gypsum, PVC); Drawing boards, T-squares, and set squares (30°/60° and 45°); Pair of compasses, dividers, drawing papers, and masking tape | Oral questions; Aural and oral assessment; Peer and self-assessment |
Term 2 Sequentially Partitioned Sub-strands & Objectives
3.1 Wall Finishes
- identify types of tools and equipment used for applying wall finishes
- describe types of wall finishes applied on buildings
- select a suitable wall finish for a building
Key Inquiry: Why are wall finishes important on a building?
Learning Resources: Digital devices with instructional video clips; Resource person guide and field observation sheets; Masonry and construction tools (trowel, spirit level, plumb bob, tape measure); Building material samples (timber, sand, cement, aggregates, bricks)
Assessment Methods: Oral questions; Observation; Practical assessment
3.2 Floor Finishes
- identify different types of floor finishes applied in buildings
- select a suitable floor finish for a building
- apply a floor finish in a building
Key Inquiry: Why are floor finishes important in building?
Learning Resources: Digital devices with instructional video clips; Resource person guide and field observation sheets; Masonry and construction tools (trowel, spirit level, plumb bob, tape measure); Building material samples (timber, sand, cement, aggregates, bricks)
Assessment Methods: Oral questions; Observation; Practical assessment
3.3 Ceilings
- identify different types of ceilings used in buildings
- select materials used for ceilings in a building
- illustrate the construction details of a ceiling
Key Inquiry: What is the need for ceilings in buildings?
Learning Resources: Realia and locally available materials (timber, manufactured boards, gypsum, PVC); Drawing boards, T-squares, and set squares (30°/60° and 45°); Pair of compasses, dividers, drawing papers, and masking tape; Technical drawing worksheets and projection charts
Assessment Methods: Oral questions; Aural and oral assessment; Peer and self-assessment
3.4 Fixings and Fittings
- identify types of fixings and fittings in buildings
- illustrate fixings and fittings used in a building
- select fixings and fittings for a given building
Key Inquiry Questions: What is the need for fixings and fittings in a building? · How are fixings and fittings selected in a building?
Learning Resources: Digital devices with instructional video clips; Resource person guide and field observation sheets; Masonry and construction tools (trowel, spirit level, plumb bob, tape measure); Building material samples (timber, sand, cement, aggregates, bricks)
Assessment Methods: Oral questions; Observation; Practical assessment
3.5 Pre cast Concrete Products
- identify pre cast concrete products used in building construction
- fabricate the formwork for a given pre cast concrete product
- make a pre cast concrete product for a building project
Key Inquiry: How do pre cast concrete products improve the building construction process?
Learning Resources: Realia and locally available materials (paving slabs, concrete blocks, lintels); Digital devices with instructional video clips; Masonry and construction tools (trowel, spirit level, plumb bob, tape measure); Building material samples (timber, sand, cement, aggregates, bricks)
Assessment Methods: Oral questions; Observation; Practical assessment
KICD Curriculum Source & Editorial Verification
Compiled directly from verified curriculum unit records matching KICD design KICD-SS-Grade12-BLD. ElimuKit preserves official strand/sub-strand codes, lesson allocations, and Key Inquiry Questions without fabricated topics. Read verification methodology →
- Building_Construction_Grade_12_-_March_2026.pdf (Printed pages 11–23) · 5 verified sub-strand units
Frequently Asked Questions
What topics are covered in Grade 12 Building Construction Term 2?
This suggested Term 2 sequence groups 5 of 14 verified KICD sub-strands (3.0 BUILDING CONSTRUCTION PROCESSES) totaling 55 lessons from the annual Grade 12 Building Construction KICD design.
Is this Term 2 division an official KICD term allocation?
No. Official KICD curriculum designs provide the authoritative annual sequence and do not prescribe Term 1, Term 2, or Term 3 assignments (our verified curriculum dataset contains no official term field). ElimuKit sequentially partitions verified units across the three terms for planning convenience—making these term divisions practical planning suggestions rather than official KICD term allocations. You can adjust strand selections for Term 2 in the scheme generator.